BUILDING
Foundation Footing
Patio Pier
Floor Joist
Fireplace
Bond Beam/Block Wall
Roof Sheathing
Pre-Roof
Roofing
Shear Nailing
Lath/Siding
Frame
Insulation
Shower Pan/Walls
Site Work
FINAL
ELECTRICAL
Conduit
Rough Electrical
Electric Meter Connection
Ag Pump
Other
FINAL
SWIMMING POOL
Pool Steel/Bonding
Pre-Deck
Fencing
Conduit
Other
FINAL
AG EXEMPT
180 Day Pull
|
PLUMBING
Ground Plumbing/Water Pipe
Water Service
Vent-Topout
Water Pipe
Interior Gas Pipe
House Sewer
Test Hole
Septic Tank
Interior Gas Pipe and Test
Exterior Gas Pipe and Test
Other
FINAL
MECHANICAL
Underground Duct
Underfloor Duct
Overhead Duct
Other
FINAL
MOBILE HOME
Lot Preparation
Water Service
Electrical Conduit
Power Pole
Gas Pipe/Test
Installation
Awning
Accessory Structure
FINAL
VIOLATION
Initial
Progress Check
Called Inspection |